2014
DOI: 10.1007/s11771-014-2093-2
|View full text |Cite
|
Sign up to set email alerts
|

Mechanism on simulation and experiment of pre-crack seam formation in stope roof

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 5 publications
0
5
0
Order By: Relevance
“…where n is the number of blocks divided by the plastic lines and V j is the volume of block j in m 3 .…”
Section: Mechanical Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…where n is the number of blocks divided by the plastic lines and V j is the volume of block j in m 3 .…”
Section: Mechanical Analysismentioning
confidence: 99%
“…The present status of the VCR method is summarized in four points: (i) ordinary emulsion explosives replace ammonium nitrate explosives to reduce blasting costs. The blasting charge structure evolved from a single-layer globular to a multiple-layer column [3], which significantly improved the blasting efficiency; (ii) down-upside funnel blasting was widely used in early VCR mining approaches, which had a limited free surface and low blasting efficiency. The kerf full-hole lateral blasting and kerf sectional lateral blasting techniques were subsequently invented to improve the blasting efficiency and have since been frequently used in VCR mining [4,5]; (iii) with the development of mining equipment, the cave height in deep hole mines can often reach 30 m, with some even exceeding 100 m. For instance, the cave height using the VCR method in the Anqing copper mine has reached 120 m; (iv) the application of a visual remote-control scraper transforms the stope bottom structure from a funnel and trench to being flat, which significantly reduces the mining workload and bottom pillar losses.…”
Section: Introductionmentioning
confidence: 99%
“…Against this backdrop, the technique of weakening suspended roof strata was born at this moment. The existing methods including borehole pre-split blasting and directional hydraulic fracturing are verified by some actual engineering practices (Hu et al, 2014;Luo et al, 2022;Sun et al, 2021). However, it is unsuitable to use a destress blasting method in highgassy mines, which may cause gas explosion accidents.…”
Section: Introductionmentioning
confidence: 99%
“…To investigate the formation mechanism of the presplit cracks, Ling proposed a fracture mechanics model of presplit blasting to analyse the effects of stress waves and quasistatic pressure of blasting gas in a blasting-induced fracturing process [11]. Based on the Holmquist-Johnson-Cook model, Hu et al built a dynamic damage model of presplit blasting and studied the evolution and formation process of the presplit cracks using numerical simulation [12]. rough numerical simulation, Cai et al reproduced the shattering induced by dynamic impact, propagation, and superposition of stress waves and crack growth driven by blasting gas in a deep-hole presplit blasting process [13,14].…”
Section: Introductionmentioning
confidence: 99%