2015 International Conference on Industrial Engineering and Operations Management (IEOM) 2015
DOI: 10.1109/ieom.2015.7093943
|View full text |Cite
|
Sign up to set email alerts
|

Metaheuristics for two-stage no-wait flexible flow shop scheduling problem

Abstract: The flexible flow-shop scheduling problem (FFSSP) is an important branch of production scheduling, the flexible flow shop is a combination of two well-known machine environments, which are flow shops and parallel machines, and it is well known that this problem is NP-hard. The no-wait requirement is a phenomenon that may occur in flow shops, and it's prevent the jobs to wait between two successive machines (or stages), jobs must be processed from the start to finish, without any interruption on machines (or st… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 29 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?