2024
DOI: 10.20944/preprints202402.0448.v1
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

Method and Simulation of a Power Supply System Operation Based on Methane Generator Supported by Energy Storage System, to Cover High Fluctuation Electrical Loads: Greenhouse Case Study

Costas Elmasides

Abstract: The analysis presented is based on actual GHU energy demand. The special feature of this load is the existence of strong daily fluctuations in energy consumption, especially during the summer months. This study presents a methodology for managing such loads with the main objective of maximizing the operating efficiency of MG.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 27 publications
(31 reference statements)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?