2006
DOI: 10.1504/ijlsm.2006.008217
|View full text |Cite
|
Sign up to set email alerts
|

Methodologies for synchronised scheduling of assembly and air transportation in a consumer electronics supply chain

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2006
2006
2020
2020

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 17 publications
(10 citation statements)
references
References 21 publications
0
10
0
Order By: Relevance
“…Main processes and decisions are: procurement, production planning and scheduling, demand management and forecasting, inventory control, customers demand allocation, simultaneous facility location and demand allocation (the so-called location-allocation decisions), transport planning, etc. (Beamon, 1998;Li et al, 2006;Dreyer et al, 2009;Manzini and Bindi, 2009;Viau et al, 2009;Manzini, 2012a).…”
Section: Food Supply Chain Strategy Collaboration Planning and Manamentioning
confidence: 99%
“…Main processes and decisions are: procurement, production planning and scheduling, demand management and forecasting, inventory control, customers demand allocation, simultaneous facility location and demand allocation (the so-called location-allocation decisions), transport planning, etc. (Beamon, 1998;Li et al, 2006;Dreyer et al, 2009;Manzini and Bindi, 2009;Viau et al, 2009;Manzini, 2012a).…”
Section: Food Supply Chain Strategy Collaboration Planning and Manamentioning
confidence: 99%
“…Chen et al (2005) found that this share had increased further in a number of OECD countries between 1990 and 1998. Source: Adopted from Li et al (2004) 17.…”
mentioning
confidence: 99%
“…A few studies on production scheduling considering air transportation with fixed departure dates are reported. Li et al (2004) studied the synchronization of single machine scheduling and air transportation with single destination. The overall problem is decomposed into air transportation problem and single machine scheduling problem.…”
Section: Literature Reviewmentioning
confidence: 99%