2020
DOI: 10.1061/(asce)ps.1949-1204.0000424
|View full text |Cite
|
Sign up to set email alerts
|

Microbiologically Induced Deterioration and Protection of Concrete in Municipal Sewerage System: Technical Review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
28
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(28 citation statements)
references
References 56 publications
0
28
0
Order By: Relevance
“…In addition to placing samples in the actual sewer system, many lab-scale evaluation methods have been developed to determine the cementitious materials' performance under MIC attack [37,38]. They can be divided into two categories: mineral acid corrosion test and microbiological simulation corrosion test.…”
Section: Evaluation Methodsmentioning
confidence: 99%
“…In addition to placing samples in the actual sewer system, many lab-scale evaluation methods have been developed to determine the cementitious materials' performance under MIC attack [37,38]. They can be divided into two categories: mineral acid corrosion test and microbiological simulation corrosion test.…”
Section: Evaluation Methodsmentioning
confidence: 99%
“…Infrastructure asset management is a comprehensive and cost-effective tool to maintain pipeline system at desired conditions. Asset management programs can develop various strategies to help utility companies and municipalities to understand the timing and associated costs of maintenance, rehabilitation, or replacement of the pipes [9].…”
Section: Introductionmentioning
confidence: 99%
“…Underground pipeline construction involves excavation to be performed very efficiently and accurately due to the existence of other utilities, including water pipes, cables, electrical power, gas pipes, and other obstacles adjacent to the wastewater pipe, which makes the work time-consuming and difficult [4,5,6]. This method however, adversely adverse impacts on the day-to-day life and activities of people and businesses around the underground construction project [5,6,7,8]. These adverse impacts include breaking of the road pavement, road closures, traffic delays [9,10,11], loss of access to businesses and homes and unwanted noise and air pollution [4,5].…”
Section: Introductionmentioning
confidence: 99%
“…These adverse impacts include breaking of the road pavement, road closures, traffic delays [9,10,11], loss of access to businesses and homes and unwanted noise and air pollution [4,5]. The resulting traffic delays can cause air pollution and other EIs involved in the SE procedure should be considered [5,6,7,8].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation