Sinkholes and the Engineering and Environmental Impacts of Karst 2005
DOI: 10.1061/40796(177)33
|View full text |Cite
|
Sign up to set email alerts
|

Micropiling in Karstic Rock: New CMFF Foundation Solution Applied at the Sanita Factory

Abstract: The new Sanita factory is a 2 story factory warehouse covering an area of 10,000 m 2 located in Zouk-Mosbeh, Lebanon. The warehouse is composed of 140 reinforced concrete columns supporting a one way pre-stressed concrete slab designed to carry 25 kN/m 2 of industrial live load plus a future steel structure. The soil substratum consists of 1 to 4 m of silt on top of the bedrock. The bedrock is hard karstic limestone with cavities and fissures. Because of the karstic nature of the rock, the original design call… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2012
2012
2014
2014

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 7 publications
0
0
0
Order By: Relevance