Proceedings of the Ocean Drilling Program 1998
DOI: 10.2973/odp.proc.ir.169.103.1998
|View full text |Cite
|
Sign up to set email alerts
|

Middle Valley: Bent Hill Area (Site 1035)

Abstract: Time on hole: 8 days, 12 hr, 30 min Bottom felt (drill pipe measurement from rig floor, m): 2434.5 Distance between rig floor and sea level (m): 11.3 Water depth (drill pipe measurement from sea level, m): 2423.2 Total depth (from rig floor, m): 2934.5 Penetration (m): 500 Number of cores (including cores with no recovery): 49 Total length of cored section (m): 406.2 Total core recovered (m): 49.11

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2000
2000
2020
2020

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 61 publications
0
0
0
Order By: Relevance