Minimizing transportation and installation costs for turbines in offshore wind farms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5
3
1

Relationship

1
8

Authors

Journals

citations
Cited by 71 publications
(21 citation statements)
references
References 24 publications
0
21
0
Order By: Relevance
“…The installation cost of the wind turbines is a function of the vessel day rates (VDR), the number of vessels (workboats, heavy lift vessels, Special Operations Vessels (SOVs), and jack up vessels; N v ), the duration of the installation (T Instal ), and the cost for the personnel (C pers ) required for carrying out the installation. Specifically for the installation of the wind turbines, the onshore pre-assembly method (M Assemb;T ) is also expected to greatly affect the cost of installation (Sarker and Faiz 2017). Although installation usually takes place during spring and summer time in order to avoid adverse weather conditions, they still play an important role to activities taking place offshore (Kaiser 2009); hence, for estimating the final installation cost of the wind farm, a weather adjustment factor (AdjW) was also considered, an approach used also by other authors in the literature (Sarker and Faiz 2017;Kaiser and Snyder 2012).…”
Section: Cost Model Of Ow Farm With Fixed Monopilementioning
confidence: 99%
See 1 more Smart Citation
“…The installation cost of the wind turbines is a function of the vessel day rates (VDR), the number of vessels (workboats, heavy lift vessels, Special Operations Vessels (SOVs), and jack up vessels; N v ), the duration of the installation (T Instal ), and the cost for the personnel (C pers ) required for carrying out the installation. Specifically for the installation of the wind turbines, the onshore pre-assembly method (M Assemb;T ) is also expected to greatly affect the cost of installation (Sarker and Faiz 2017). Although installation usually takes place during spring and summer time in order to avoid adverse weather conditions, they still play an important role to activities taking place offshore (Kaiser 2009); hence, for estimating the final installation cost of the wind farm, a weather adjustment factor (AdjW) was also considered, an approach used also by other authors in the literature (Sarker and Faiz 2017;Kaiser and Snyder 2012).…”
Section: Cost Model Of Ow Farm With Fixed Monopilementioning
confidence: 99%
“…Specifically for the installation of the wind turbines, the onshore pre-assembly method (M Assemb;T ) is also expected to greatly affect the cost of installation (Sarker and Faiz 2017). Although installation usually takes place during spring and summer time in order to avoid adverse weather conditions, they still play an important role to activities taking place offshore (Kaiser 2009); hence, for estimating the final installation cost of the wind farm, a weather adjustment factor (AdjW) was also considered, an approach used also by other authors in the literature (Sarker and Faiz 2017;Kaiser and Snyder 2012). Therefore, the cost is expressed as C 3:…”
Section: Cost Model Of Ow Farm With Fixed Monopilementioning
confidence: 99%
“…Fixed-bottom offshore wind turbines are already commercialized, but there is still opportunity for reducing their cost. In particular, the installation phase is an area of ongoing innovation (Sarker and Faiz 2017), with a focus on new piling and alternative installation technologies that avoid transition-piece-related reliability issues, while at the same time reducing environmental impact.…”
Section: Innovations To Reduce Lcoementioning
confidence: 99%
“…This model determines the optimal schedule for maintaining the turbines and the optimal routes for the crew transfer vessels to visit the turbines along with the number of technicians required for each vessel. Sarker and Faiz (2017) developed a model for wind turbine installation and transportation in an oshore wind farm to minimise the total cost where the eects of wind farm and vessel parameters on cost are investigated. Recently, Barlow et al (2018) proposed a mixed-method framework to address current oshore wind farm installation projects.…”
Section: Applied a Simulationmentioning
confidence: 99%