Mining building information modeling (BIM) event logs for improved project management

Abstract: The contributions of the co-authors are as follows:• I was the lead investigator for literature review, formal analysis, and paper writing.• Prof. Zhang Limao provided the conceptualization and the initial project direction and edited the manuscript drafts.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 218 publications
(240 reference statements)
0
1
0
Order By: Relevance
“…The close integration of MA project-based collaborative decision making and an incentive-compensation structure will improve project performance. Compared with traditional delivery projects, some case studies manifest that the integrated application of BIM and IPD widely recognized by practitioners has more potential to increase labor productivity, support the design of energy efficient buildings, obtain reliable and accurate cost estimates and budgets, save costs, improve build quality, shorten construction schedules, reduce coordination change orders and construction RFIs, and optimize facility management and maintenance [63][64][65][66][67]. Moreover, LC offers some innovations for project operating systems that reduce waste, shorten schedules, and increase labor productivity and project quality, resulting in many IPD projects accepting and implementing LC [68].…”
Section: Hypothesis 7 (H7) Catalysts Have a Positive Impact On Projec...mentioning
confidence: 99%
“…The close integration of MA project-based collaborative decision making and an incentive-compensation structure will improve project performance. Compared with traditional delivery projects, some case studies manifest that the integrated application of BIM and IPD widely recognized by practitioners has more potential to increase labor productivity, support the design of energy efficient buildings, obtain reliable and accurate cost estimates and budgets, save costs, improve build quality, shorten construction schedules, reduce coordination change orders and construction RFIs, and optimize facility management and maintenance [63][64][65][66][67]. Moreover, LC offers some innovations for project operating systems that reduce waste, shorten schedules, and increase labor productivity and project quality, resulting in many IPD projects accepting and implementing LC [68].…”
Section: Hypothesis 7 (H7) Catalysts Have a Positive Impact On Projec...mentioning
confidence: 99%