2021
DOI: 10.1007/s40295-021-00280-1
|View full text |Cite
|
Sign up to set email alerts
|

Mission Design for the 2020 Mercury Lander Decadal Survey

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…The cruise stage minimizes the fuel load required with an SEP system for a low-thrust trajectory to Mercury (Shannon et al 2021). A nominal mission timeline selected for this concept study is shown in Table 2; alternate launch and trajectory options exist for a Mercury Lander mission.…”
Section: Mission Concept Overviewmentioning
confidence: 99%
“…The cruise stage minimizes the fuel load required with an SEP system for a low-thrust trajectory to Mercury (Shannon et al 2021). A nominal mission timeline selected for this concept study is shown in Table 2; alternate launch and trajectory options exist for a Mercury Lander mission.…”
Section: Mission Concept Overviewmentioning
confidence: 99%