2010
DOI: 10.1057/mel.2010.14
|View full text |Cite
|
Sign up to set email alerts
|

Mobile offshore drilling rig newbuild and replacement cost functions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(1 citation statement)
references
References 27 publications
0
1
0
Order By: Relevance
“…Water supply suspension may cause substitution consumption or industrial production shutdown. Functional replacement cost analysis is a common method in estimating the economic losses brought about by water supply suspensions [ 21 , 22 ]. The value of this special function may be assessed by estimating the cost of the cheapest water replacement with the same effect ( Table 3 ).…”
Section: Methodsmentioning
confidence: 99%
“…Water supply suspension may cause substitution consumption or industrial production shutdown. Functional replacement cost analysis is a common method in estimating the economic losses brought about by water supply suspensions [ 21 , 22 ]. The value of this special function may be assessed by estimating the cost of the cheapest water replacement with the same effect ( Table 3 ).…”
Section: Methodsmentioning
confidence: 99%