2023
DOI: 10.1049/gtd2.12899
|View full text |Cite
|
Sign up to set email alerts
|

Model selection and mechanism design for electricity markets in hydropower‐rich regions: Adaptation study

Abstract: The development of foreign electricity markets has been relatively complete, while China's electricity market started late and the design of the market mechanism needs to be improved, so the selection of a suitable market model and the design of the market mechanism in hydropower‐rich regions is conducive to the healthy development of the electricity market. While most of the first eight pilot regions in China have entered the long‐period continuous operation stage, and all the second batch of six power spot p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 14 publications
0
0
0
Order By: Relevance
“…Step ii: Under the constraints of power system operating, the system operator arranges the pre-output of each unit with the minimum expected purchase cost according to Equa-tion (11). The pre-output of conventional unit i is P CO * i,t (B), and the pre-output of stochastic generator j is P RE * j,t (B).…”
Section: Vcg Clearing Process In Day-ahead Marketmentioning
confidence: 99%
See 2 more Smart Citations
“…Step ii: Under the constraints of power system operating, the system operator arranges the pre-output of each unit with the minimum expected purchase cost according to Equa-tion (11). The pre-output of conventional unit i is P CO * i,t (B), and the pre-output of stochastic generator j is P RE * j,t (B).…”
Section: Vcg Clearing Process In Day-ahead Marketmentioning
confidence: 99%
“…Step iv: For conventional unit i, calculate the expected cost, ∼ C CO i (B), by Equation ( 12), the objective function value of Equation (11), where conventional unit i does not participate in the market, and the VCG payment of the unit by Equation (13).…”
Section: Vcg Clearing Process In Day-ahead Marketmentioning
confidence: 99%
See 1 more Smart Citation