2022
DOI: 10.1108/ecam-01-2022-0010
|View full text |Cite
|
Sign up to set email alerts
|

Modeling for external stakeholder risk assessment of project portfolios

Abstract: PurposeExternal stakeholder risks (ESRs) caused by unfavorable behaviors hinder the success of project portfolios (PPs). However, due to complex project dependency and numerous risk causality in PPs, assessing ESRs is difficult. This research aims to solve this problem by developing an ESR-PP two-layer fuzzy Bayesian network (FBN) model.Design/methodology/approachA two-layer FBN model for evaluating ESRs with risk causality and project dependency is proposed. The directed acyclic graph (DAG) of an ESR-PP netwo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
13
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(13 citation statements)
references
References 106 publications
0
13
0
Order By: Relevance
“…These linguistic variables are then converted into specific fuzzy numbers, with detailed divisions of fuzzy probability intervals outlined in Table 3. Subsequently, the SAM (Bai et al, 2024;Hsi-Mei Hsu & Chen-Tung Chen, 1996;Lu et al, 2023) aggregates assessments from various experts. The defuzzification of fuzzy numbers, a crucial step in decision-making, is carried out using the CoA method (Runkler & Glesner, 1993;Varghese et al, 2012) along with formulas (4) and ( 5) (P. Chen et al, 2022;Onisawa, 1990;Van Laarhoven & Pedrycz, 1983).…”
Section: Determining the Prior Probabilities Of Root Nodesmentioning
confidence: 99%
“…These linguistic variables are then converted into specific fuzzy numbers, with detailed divisions of fuzzy probability intervals outlined in Table 3. Subsequently, the SAM (Bai et al, 2024;Hsi-Mei Hsu & Chen-Tung Chen, 1996;Lu et al, 2023) aggregates assessments from various experts. The defuzzification of fuzzy numbers, a crucial step in decision-making, is carried out using the CoA method (Runkler & Glesner, 1993;Varghese et al, 2012) along with formulas (4) and ( 5) (P. Chen et al, 2022;Onisawa, 1990;Van Laarhoven & Pedrycz, 1983).…”
Section: Determining the Prior Probabilities Of Root Nodesmentioning
confidence: 99%
“…Hence, researching stakeholders and managing their associated risks represents a crucial and indispensable step in the execution of a project. Currently, many researchers have studied stakeholder risk [ 27 ] from the perspectives of a single project and PP.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Regarding ESR assessment, Bai, Kang et al [ 27 ] constructed a Bayesian network (BN) model by considering risk interaction and project dependency. Although they considered stakeholder risk assessment in PP, the risk management process is inadequate without considering risk responses [ 34 ].…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations