TSO-DSO Interactions and Ancillary Services in Electricity Transmission and Distribution Networks 2019
DOI: 10.1007/978-3-030-29203-4_3
|View full text |Cite
|
Sign up to set email alerts
|

Modeling of Complex Systems Including Transmission, Distribution, Aggregation, Ancillary Services Markets

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 21 publications
0
3
0
Order By: Relevance
“…As a result, the DSO needs sufficient new active network management schemes to coordinate traditional functionalities, distributed flexible energy resources control settings, and possible new market structures [6]- [9]. Besides, conventional generators are currently the main resources that provide flexibility services for TSOs [9], [11]. In this regard, the flexibility potential of flexible energy resources located at distribution networks and demand-side resources needs to be fully utilized for the provision of the flexibility for the future power systems.…”
Section: A Motivationmentioning
confidence: 99%
“…As a result, the DSO needs sufficient new active network management schemes to coordinate traditional functionalities, distributed flexible energy resources control settings, and possible new market structures [6]- [9]. Besides, conventional generators are currently the main resources that provide flexibility services for TSOs [9], [11]. In this regard, the flexibility potential of flexible energy resources located at distribution networks and demand-side resources needs to be fully utilized for the provision of the flexibility for the future power systems.…”
Section: A Motivationmentioning
confidence: 99%
“…Flexibility services can be provided by different FERs located in the transmission network and/or the distribution network. Exploiting the maximum flexibility potential of the power system requires the active utilization of FERs in all levels of the system [2]. Currently, transmission-network-connected FERs such as conventional generators are the only resources being deployed to satisfy system-wide (TSO-level) flexibility needs [3], [4].…”
Section: A Motivationmentioning
confidence: 99%
“…The variable that helps to calculate the maximum upward flexible capacities of the LEC is defined by (2).…”
Section: ) Flexibility Estimationmentioning
confidence: 99%