Thermophysical Basis of Energy Technologies (Tbet 2020) 2021
DOI: 10.1063/5.0042520
|View full text |Cite
|
Sign up to set email alerts
|

Modeling the transportation assesment with MS excel solver

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…1. According to experimental statistical models of f cm1 , f cm28 , E pr1 (see Table 4) using the methods of mathematical optimization [25], find the values of factors (consumptions of cement and slag, and superplasticizer content) that provide required indicators and satisfying the condition that the total cost of these components is minimal (Table 6). For calculations purposes, the following cost of components was assumed: cement-88 EUR/t, ground blast-furnace slag-27 EUR/t, superplasticizer-2.85 EUR/t.…”
Section: Solutionmentioning
confidence: 99%
“…1. According to experimental statistical models of f cm1 , f cm28 , E pr1 (see Table 4) using the methods of mathematical optimization [25], find the values of factors (consumptions of cement and slag, and superplasticizer content) that provide required indicators and satisfying the condition that the total cost of these components is minimal (Table 6). For calculations purposes, the following cost of components was assumed: cement-88 EUR/t, ground blast-furnace slag-27 EUR/t, superplasticizer-2.85 EUR/t.…”
Section: Solutionmentioning
confidence: 99%