2013
DOI: 10.1002/nav.21547
|View full text |Cite
|
Sign up to set email alerts
|

Models for production planning under power interruptions

Abstract: We present a robust optimization model for production planning under the assumption that electricity supply is subject to uncertain interruptions caused by participation in interruptible load contracts (ILCs). The objective is to minimize the cost of electricity used for production while providing a robust production plan which ensures demand satisfaction under all possible interruption scenarios. The combinatorial size of the set of interruption scenarios makes this a challenging problem. Furthermore, we assu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 38 publications
0
4
0
Order By: Relevance
“…Latifoglu et al [22] presented an optimization model for aggregate production planning under the assumption that electricity supply is subject to uncertain interruptions caused by participation in uninterruptible load contracts. The objective was to minimize the cost of electricity used in production by providing a robust production plan to guarantee demand satisfaction in all possible outage scenarios.…”
Section: Theoretical Backgroundmentioning
confidence: 99%
“…Latifoglu et al [22] presented an optimization model for aggregate production planning under the assumption that electricity supply is subject to uncertain interruptions caused by participation in uninterruptible load contracts. The objective was to minimize the cost of electricity used in production by providing a robust production plan to guarantee demand satisfaction in all possible outage scenarios.…”
Section: Theoretical Backgroundmentioning
confidence: 99%
“…The second type considered the number of times the load was reduced or interrupted. In the article by [65], a robust optimization approach was presented in which uncertain power interruptions were included in aggregate production planning. A constraint was integrated that limited the number of such power interruptions to a certain value.…”
Section: Ecological Consideration Of Load Managementmentioning
confidence: 99%
“…Nevertheless, most of past studies looked at management in a single power plant. For example, Latifoğlu et al (2013) created a production model of electric power generation under given certain assumptions and interruption scenarios to reduce the cost of producing electricity and to ensure customer satisfaction. A robust framework using heuristic procedure was also developed, and a computational experiment was conducted to validate the model.…”
Section: Strategic and Operational Management In Power Plantsmentioning
confidence: 99%
“…Some of them developed the managerial and production strategies for power plants (Huang et al, 2004;Lazzaretto & Carraretto, 2006;). While, some of them investigated the problems faced by the power plants and proposed the planning (Cerri et al, 2009;Kragelund et al, 2012), and built the production models under assumptions (Latifoğlu et al, 2013).…”
Section: Consideration Of the Findings In Light Of Existing Researchesmentioning
confidence: 99%