Multi-Area Interchange Scheduling Under Uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
16
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 20 publications
(16 citation statements)
references
References 15 publications
0
16
0
Order By: Relevance
“…1, which takes the distribution network with DG (i.e., the distribution network includes two different entities: DNO and DG owner) as an example. And the original distribution network and be decomposed into two regions (i.e., distribution network region and DG region) through duplicating boundary bus N. More details about region decomposition could be found in [23], [24].…”
Section: A Virtual Region Decompositionmentioning
confidence: 99%
See 1 more Smart Citation
“…1, which takes the distribution network with DG (i.e., the distribution network includes two different entities: DNO and DG owner) as an example. And the original distribution network and be decomposed into two regions (i.e., distribution network region and DG region) through duplicating boundary bus N. More details about region decomposition could be found in [23], [24].…”
Section: A Virtual Region Decompositionmentioning
confidence: 99%
“…Besides, nodes 18 and 26 are equipped with 10MW and 8MW wind turbines (WT) respectively. In addition, the load connected with nodes 15,16,19,20,23,24,30 and 31 are assumed FL (i.e.,prosumers) and the others are CL. The load data of distribution are derived from the actual operation data in Henan Province, China, and the total prediction load curve (i.e., the sum of CL and FL before implementing DR program) and the prediction output of WT in a typical day are shown in Fig.…”
Section: A Basic Datamentioning
confidence: 99%
“…This is due to the way regional system operators and the higher-level system operator (or coordinator) are organised, e.g. the hierarchical control architecture in China [3,4], and the proxy bus systems in the US [5,6]. Although easy to implement, current methods may suffer from suboptimality or market inefficiency [4,6].…”
Section: Parameters Nl a Gmentioning
confidence: 99%
“…In practice, an ISO may need to set multiple interfaces simultaneously. An extension to interchange scheduling involving more than two areas is nontrivial, see [19]. Generalizations to CTS to a stochastic setting is considered in [20].…”
Section: Literature Reviewmentioning
confidence: 99%
“…When there are more than two areas, tie-line congestions may induce positive shadow prices ρ for interface bids over other interfaces. Nevertheless, the calculation of ρ is the same as in(19), and the shadow price should be evenly split by neighboring areas.…”
mentioning
confidence: 99%