The progress monitoring (PM) of construction projects is an essential aspect of project control that enables the stakeholders to make timely decisions to ensure successful project delivery, but ongoing practices are largely manual and document-centric. However, the integration of technologically advanced tools into construction practices has shown the potential to automate construction PM (CPM) using real-time data collection, analysis, and visualization for effective and timely decision making. In this study, we assess the level of automation achieved through various methods that enable automated computer vision (CV)-based CPM. A detailed literature review is presented, discussing the complete process of CV-based CPM based on the research conducted between 2011 and 2021. The CV-based CPM process comprises four sub-processes: data acquisition, information retrieval, progress estimation, and output visualization. Most techniques encompassing these sub-processes require human intervention to perform the desired tasks, and the inter-connectivity among them is absent. We conclude that CV-based CPM research is centric on resolving technical feasibility studies using image-based processing of site data, which are still experimental and lack connectivity to its applications for construction management. This review highlighted the most efficient techniques involved in the CV-based CPM and accentuated the need for the inter-connectivity between sub-processes for an effective alternative to traditional practices.