2019
DOI: 10.1007/s11269-019-02349-x
|View full text |Cite
|
Sign up to set email alerts
|

Multi-objective Decision-Making for the Ecological Operation of Built Reservoirs Based on the Improved Comprehensive Fuzzy Evaluation Method

Abstract: With the social progress and economic development, people have put forward requirements for the ecological operation of built reservoirs. However, there are conflicts between the ecological landscape and the existing benefits such as irrigation and flood control, so it is necessary to build a decision-making model for the comprehensive value of the ecological operation of reservoirs. Taking a reservoir project which needs to satisfy multi-objective requirements as an example, this paper proposes a set of decis… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
18
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
2
1

Relationship

2
7

Authors

Journals

citations
Cited by 27 publications
(18 citation statements)
references
References 23 publications
0
18
0
Order By: Relevance
“…=for all m schemes. In order to make the data highly comparable and the modeling universal, this study adopts the percentage system (Liu et al 2019) and the maximum-minimum standardization method to standardize the evaluating indexes a(i, j).…”
Section: Construction Of the Index Functionmentioning
confidence: 99%
“…=for all m schemes. In order to make the data highly comparable and the modeling universal, this study adopts the percentage system (Liu et al 2019) and the maximum-minimum standardization method to standardize the evaluating indexes a(i, j).…”
Section: Construction Of the Index Functionmentioning
confidence: 99%
“…A comprehensive evaluation of U of the first equipment is made by formula (21), and the result is C (1) � W • R (1) � (0.3731, 0.3579, 0.1846, 0.0844), and as- (8,6,4,2); the comprehensive evaluation value Z (1) of the first evaluated equipment is Z (1) � C (1) • E (T) � 6.0392.…”
Section: Mathematical Problems In Engineeringmentioning
confidence: 99%
“…Multi-index comprehensive evaluation is a common method to solve equipment division. According to different weight determination methods, it can be divided into three categories: e first is subjective weighting method, such as AHP [1,2], Delphi method [3], and fuzzy comprehensive evaluation method [4]. is method is greatly influenced by human factors with subjective judgment color.…”
Section: Introductionmentioning
confidence: 99%
“…A fuzzy comprehensive evaluation is a scientific description of the fuzzy things, phenomena, and concepts in the transitional stage of the material system [52]. The specific steps of establishing a fuzzy evaluation model for calculating agricultural WUE are summarized as follows:…”
Section: Fuzzy Comprehensive Evaluation Modelmentioning
confidence: 99%