2023
DOI: 10.3390/en16020976
|View full text |Cite
|
Sign up to set email alerts
|

Multi-Objective Dispatch of PV Plants in Monopolar DC Grids Using a Weighted-Based Iterative Convex Solution Methodology

Abstract: The design of an efficient energy management system (EMS) for monopolar DC networks with high penetration of photovoltaic generation plants is addressed in this research through a convex optimization point of view. The EMS is formulated as a multi-objective optimization problem that involves economic, technical, and environmental objective functions subject to typical constraints regarding power balance equilibrium, thermal conductor capabilities, generation source capacities, and voltage regulation constraint… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 30 publications
(60 reference statements)
0
1
0
Order By: Relevance
“…where γ ∈ {0, 1} defines the set of uncertainties; ppv kh and ppv kh are the power available from the PV generator and its deviation, respectively; pd kh is the power consumption of the load, and pd kh is its deviation. Note that in (34) and (35), only the values in the following intervals are considered:…”
Section: Robust Formulationmentioning
confidence: 99%
“…where γ ∈ {0, 1} defines the set of uncertainties; ppv kh and ppv kh are the power available from the PV generator and its deviation, respectively; pd kh is the power consumption of the load, and pd kh is its deviation. Note that in (34) and (35), only the values in the following intervals are considered:…”
Section: Robust Formulationmentioning
confidence: 99%