2019 IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Syst 2019
DOI: 10.1109/eeeic.2019.8783489
|View full text |Cite
|
Sign up to set email alerts
|

Multiobjective Congestion Management and Transmission Switching Ensuring System Reliability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 10 publications
0
5
0
Order By: Relevance
“…As mentioned before, the market participants are defined based on a self-determining microgrid and smart grid, which include some generation units based on fossil fuel, buses, lines and electrical loads, all of which are connected in IEEE 24-bus test system. Besides that, the microgrid supplies the loads located in the far areas using renewable resources, such as photovoltaic unit, wind turbine, tidal turbine system and storage unit [33][34][35]. To elaborate on the proposed concepts, we implement and conduct the P2P energy market and the proposed blockchain architecture and then examinate the obtained results based on the different point of views as follows:…”
Section:  V Simulation Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…As mentioned before, the market participants are defined based on a self-determining microgrid and smart grid, which include some generation units based on fossil fuel, buses, lines and electrical loads, all of which are connected in IEEE 24-bus test system. Besides that, the microgrid supplies the loads located in the far areas using renewable resources, such as photovoltaic unit, wind turbine, tidal turbine system and storage unit [33][34][35]. To elaborate on the proposed concepts, we implement and conduct the P2P energy market and the proposed blockchain architecture and then examinate the obtained results based on the different point of views as follows:…”
Section:  V Simulation Resultsmentioning
confidence: 99%
“…Regarding the encryption algorithm, any faulty node can be recognized quickly and nodes of network will eventuality update their data block and label during the hashing process. The HAs are defined based on the 32-bit compounded words with regards to sundry hash functions [34] such as SHA-512, SHA-384, SHA-256, SHA-224 and SHA-1, including letters and numbers {0-9, A-F}.…”
Section: ) Cryptographic Processmentioning
confidence: 99%
“…Generally, such a structure is based on a P2P construction in order to leave/join from/to the network independently. It is axiomatic that the decentralization-based network architecture is able to reduce the failures of the nodes and connection [43]. As a second part, the blockchain process needs to have an effective consensus protocol organized through P2P-based construction to validate transactions related to every node.…”
Section: Blockchain Structurementioning
confidence: 99%
“…Hence, it seems that DGRs are able to boost the problems' definition (high-energy consumption of miners) and are defined in the following manner. We decide to effectively use the operative units such as the storage unit, wind turbines (WTs), photovoltaic (PV), and tidal units located on the buses of the smart grid [38]. Firstly, each unit aims to pursue its cost-efficient-based objective function in accordance with Equation (21).…”
Section: The Basic Formulation Of the Smart Gridmentioning
confidence: 99%