2015
DOI: 10.1016/j.enconman.2015.08.055
|View full text |Cite
|
Sign up to set email alerts
|

Multistage distribution network expansion planning considering the emerging energy storage systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
38
0
2

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 82 publications
(40 citation statements)
references
References 33 publications
0
38
0
2
Order By: Relevance
“…Fans are utilized practically as a bit of summer, habitually around evening time. Regular TV working time is 5.5 hr reliably . The central weight or vitality use layout normally changes more than 24 hr and over various months of the year.…”
Section: Methodsmentioning
confidence: 99%
“…Fans are utilized practically as a bit of summer, habitually around evening time. Regular TV working time is 5.5 hr reliably . The central weight or vitality use layout normally changes more than 24 hr and over various months of the year.…”
Section: Methodsmentioning
confidence: 99%
“…Correspondingly, the planning horizons of them are 16-30 years [35,41,52,64], 6-15 years [34,42,59,61,71,96,97], and 1-5 years [31,38,43,67,84,86], respectively. In most of the articles, capital recovery factor is adopted to calculate the net present value of equal annual cash flows and economic objectives.…”
Section: Methods To Deal With Multiple Time Scalesmentioning
confidence: 99%
“…Therefore, the allocation of ESSs (sizing and sitting) has a great impact on the ADS planning and has been perceived to be one of indispensable parts of ADS planning [67].…”
Section: Optimal Allocation Of Esssmentioning
confidence: 99%
See 1 more Smart Citation
“…With high levels of PV penetration it is expected that distributed generation will be installed on each phase, as such, for effective voltage unbalance mitigation a 3 phase connection is required, or separate batteries on each phase. In addition, Saboori et al showed that when constructing new distribution networks, including grid-connected energy storage reduces planning complexity and cost [39].…”
Section: Feeder Connected Battery Considerationsmentioning
confidence: 99%