Volume 2: Safety and Reliability; Pipeline Technology 2003
DOI: 10.1115/omae2003-37120
|View full text |Cite
|
Sign up to set email alerts
|

New Guidance on the Design of Offshore Structures to Resist the Explosion Hazard

Abstract: In 1992 Interim Guidance Notes were issued in the UK to provide guidance for the design of offshore topsides for fires and explosions. This Guidance was one consequence of the Piper Alpha Tragedy in the North Sea. Since 1992 a great deal of further research and technology has been developed in order to improve understanding of the characteristics of fires and explosions and the response of the structures and equipment to these events. In order to collate this new information in a readily useable format, the Un… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
7
0

Year Published

2004
2004
2020
2020

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 0 publications
0
7
0
Order By: Relevance
“…For plastic response, the concept of ductility factor l is adopted where it is multiplied to the right-hand side of Eq. (6) to obtain the plastic deformation. They are given as follows:…”
Section: Maximum Dynamic Responsementioning
confidence: 99%
See 1 more Smart Citation
“…For plastic response, the concept of ductility factor l is adopted where it is multiplied to the right-hand side of Eq. (6) to obtain the plastic deformation. They are given as follows:…”
Section: Maximum Dynamic Responsementioning
confidence: 99%
“…The concept of strength level blast (SLB) and ductility level blast (DLB) have been proposed in Ref. [6]. Under SLB, elements are expected to behave in an elastic manner.…”
Section: Introductionmentioning
confidence: 99%
“…The fire risk assessment and management, which includes presented rules and recommended practices, have been identified for reducing the risk of fire accidents Paik, 2012a, 2012b;Spouge, 1999;NORSOK, 2010;ABS, 2014;LR, 2014). In addition, design guidelines have been established to detail the methods of fire risk assessment and management (Nolan, 1996;Walker et al, 2003;Vinnem, 2007;Paik and Czujko, 2009, 2010, 2011.…”
Section: Introductionmentioning
confidence: 99%
“…Tools such as FLACS, PROEXP, or AutoReGas are available for this effort (e.g. Moan, 2000b;Czujko, 2001, Walker et al, 2003. Typical overpressures for topsides of North Sea plat-forms are in the range 0.2-0.6 barg, with a duration of 0.1-0.5s., while open air explosions typically imply 0.1 barg with a duration of 0.2s.…”
Section: Accidental Actionsmentioning
confidence: 99%