2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe) 2012
DOI: 10.1109/isgteurope.2012.6465686
|View full text |Cite
|
Sign up to set email alerts
|

New information technologies for state estimation of power systems with FACTS

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0
1

Year Published

2014
2014
2024
2024

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 17 publications
(5 citation statements)
references
References 14 publications
0
4
0
1
Order By: Relevance
“…The set, containing other buses, is referred to as . For the case, presented in Figure 1, (1, 2, 4, 9,10), p  (3,5,6,7,8,11,12,13,14) q  . The electric current phasor measurements of the branches, which are incident to PMU-equipped buses, are not used, because in case of their fault, the observability of the power system may be lost.…”
Section: Accelerated Steady-state Power Flow Calculation Using the Pmmentioning
confidence: 99%
See 2 more Smart Citations
“…The set, containing other buses, is referred to as . For the case, presented in Figure 1, (1, 2, 4, 9,10), p  (3,5,6,7,8,11,12,13,14) q  . The electric current phasor measurements of the branches, which are incident to PMU-equipped buses, are not used, because in case of their fault, the observability of the power system may be lost.…”
Section: Accelerated Steady-state Power Flow Calculation Using the Pmmentioning
confidence: 99%
“…An interesting result was obtained for IEEE-57 test network [15]. The set (1,3,4,6,7,9,10,11,12,14) p  includes 10 measurements ( dim( ) 10 p  ), which is less than resulting amount of PMUs from other existing PMU placement algorithms А4 [11], A5 [3], A6 [13], A7 [12]. The comparison is presented in Table 1.…”
Section: Pmu Devices Number Minimizationmentioning
confidence: 99%
See 1 more Smart Citation
“…It is not difficult to show [18] that if we have got the vectors (complexes) of voltages and currents of the positive sequence of the fundamental harmonic from the PMU, installed at the ends of the transmission line, for any i-th moment in time, the parameters of the πequivalent circuit can be determined as:…”
Section: Introductionmentioning
confidence: 99%
“…По состоянию на 2015 г. в российской энергосистеме было установлено около четырехсот устройств СВИ (УСВИ), а общее количество УСВИ в Северной Америке в том же году составляло около 2000 единиц [5,6]. В последние 10-15 лет в отечественной и зарубежной литературе появилось немало публикаций, посвященных актуализации параметров воздушных линий электропередачи (ВЛЭП) с использованием СВИ [1,[7][8][9][10]. При этом соответствующие алгоритмы, предлагаемые во многих работах, часто достаточно сложны и требуют решения оптимизационной задачи [9][10][11][12].…”
unclassified