“…The set, containing other buses, is referred to as . For the case, presented in Figure 1, (1, 2, 4, 9,10), p (3,5,6,7,8,11,12,13,14) q . The electric current phasor measurements of the branches, which are incident to PMU-equipped buses, are not used, because in case of their fault, the observability of the power system may be lost.…”