2019
DOI: 10.1109/access.2019.2950815
|View full text |Cite
|
Sign up to set email alerts
|

New Integrated Model for Maintenance Planning and Quality Control Policy for Multi-Component System Using an EWMA Chart

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
5
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
2

Relationship

2
5

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 39 publications
0
5
0
1
Order By: Relevance
“…1) Suppose a multi-component system has critical components that influence the system's reliability, and the system will stop working if those components fail [57]. 2) Preventive maintenance procedures for critical system components are performed without a need for a system to stop working, while corrective maintenance procedures cannot be performed without a system stopping [58].…”
Section: B Assumptionsmentioning
confidence: 99%
See 1 more Smart Citation
“…1) Suppose a multi-component system has critical components that influence the system's reliability, and the system will stop working if those components fail [57]. 2) Preventive maintenance procedures for critical system components are performed without a need for a system to stop working, while corrective maintenance procedures cannot be performed without a system stopping [58].…”
Section: B Assumptionsmentioning
confidence: 99%
“…In this case, the costs for system restoration include spare parts costs, maintenance labor costs, and production loss costs due to system shutdown. The expected corrective maintenance cost (EC CM ) can be calculated as follows [57,58].…”
Section: Expected Costs For Repairing and Restoring A Systemmentioning
confidence: 99%
“…Suppose that the initial value of the process mean can be shown, i.e., = , and suppose that is the real value of obtained from sample . Thus, the EWMA statistic, as calculated by A. S. Adel, M. et al [44] is defined as follows:…”
Section: Assumptionsmentioning
confidence: 99%
“…Srivastava and Wu [46] proposed an optimal value of which minimizes for given . The optimum is given by [44] as follows:…”
Section: Assumptionsmentioning
confidence: 99%
“…a EWMA prevê onde a média estará no próximo período, o que a torna facilmente aplicável na indústria(AL-SHAYEA et al, 2019).Em um número consideravelmente menor, algumas desvantagens quanto à utilização da carta de controle foram apresentadas por alguns autores, conforme mostra o Quadro 2.Quadro 2 -Desvantagens da utilização da carta de controle…”
unclassified