2013
DOI: 10.2478/ijnaoe-2013-0122
|View full text |Cite
|
Sign up to set email alerts
|

New shipyard layout design for the preliminary phase & case study for the green field project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 20 publications
(7 citation statements)
references
References 4 publications
0
7
0
Order By: Relevance
“…Existing models can be optimized using various tools available in ARENA like OptQuest which can be achieved by changing the resources available (Neeraj, Nithin, Niranjhan, Sumesh, & Thenarasu, 2018). Similarly ARENA and discrete event simulation has been utilised in shipyard studies as well; from design of the yard to optimisation (Caprace, Moreira Freire, Assiss, Martin Pires, & Rigo, 2011;Chabane, 2004;Goo, Chung, & Han, 2019;Ju, Sung, Shen, Jeong, & Shin, 2020;Ozkok, 2012;Song & Woo, 2013) in order to increase the throughput, decreasing the costs or to boost the utilisation of the resources in the shipyards.…”
Section: Shipdigest Project Developed An Innovative Vocational Educat...mentioning
confidence: 99%
“…Existing models can be optimized using various tools available in ARENA like OptQuest which can be achieved by changing the resources available (Neeraj, Nithin, Niranjhan, Sumesh, & Thenarasu, 2018). Similarly ARENA and discrete event simulation has been utilised in shipyard studies as well; from design of the yard to optimisation (Caprace, Moreira Freire, Assiss, Martin Pires, & Rigo, 2011;Chabane, 2004;Goo, Chung, & Han, 2019;Ju, Sung, Shen, Jeong, & Shin, 2020;Ozkok, 2012;Song & Woo, 2013) in order to increase the throughput, decreasing the costs or to boost the utilisation of the resources in the shipyards.…”
Section: Shipdigest Project Developed An Innovative Vocational Educat...mentioning
confidence: 99%
“…In most cases, the focus is again on flow through the process, with time a key metric, an exception being Cohen (2010) who uses service level as a measure in relation to a technical support team. Although focusing on flow, Bartholdi and Gue (2000), Song and Woo (2013) and Mishra, Roy and van Ommeren (2017) model facility layouts.…”
Section: Operations Re-engineeringmentioning
confidence: 99%
“…On open sites of the territory, the assembling of ship hulls is being carried out. The open areas are subjected to changeable climatic conditions, which reduce the efficiency of the production process [1][2]. In our paper, it is proposed to cover by mobile moving structures the shipyard open territory, which was built in Klaipeda (Lithuania, the EU) in 1952 (Figs.…”
Section: Introductionmentioning
confidence: 99%