Abstract:Purpose: Adjusted discrete Multi-Objective Invasive Weed Optimization (DMOIWO) algorithm, which uses fuzzy dominant approach for ordering, has been proposed to solve No-wait two-stage flexible flow shop scheduling problem.Design/methodology/approach: No-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times and probable rework in both stations, different ready times for all jobs and rework times for both stations as well as unrelated parallel machines with regards to the simultaneous minimization of maximum job completion time and average latency functions have been investigated in a multi-objective manner. In this study, the parameter setting has been carried out using Taguchi Method based on the quality indicator for better performance of the algorithm.
Findings:The results of this algorithm have been compared with those of conventional, multiobjective algorithms to show the better performance of the proposed algorithm. The results clearly indicated the greater performance of the proposed algorithm.-887-Journal of Industrial Engineering and Management -https://doi.org/10.3926/jiem.2348 Originality/value: This study provides an efficient method for solving multi objective no-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times, probable rework in both stations, different ready times for all jobs, rework times for both stations and unrelated parallel machines which are the real constraints.Keywords: no-wait two-stage flexible flow shop, setup time of the machinery, probable rework, adjusted discrete multi-objective invasive weed optimization