Novel Dual Parallel-Connected-Pump Hydraulic System and Error Allocation Strategy for Segment Assembly
Lijie Jiang,
Zhe Zheng,
Kaihao Zhu
et al.
Abstract:Segment assembly is one of the principal processes during tunnel construction using a tunnel boring machine (TBM). The segment erector is a robotic manipulator powered by a hydraulic system that assembles prefabricated concrete segments onto the excavated tunnel surface. In the case of a larger diameter, while the segment assembly has a more extensive range of motion, it also demands more control accuracy. However, the single-pump-based hydraulic system fails to meet the dual requirements. Therefore, this pape… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.