2024
DOI: 10.11648/j.pse.20240802.14
|View full text |Cite
|
Sign up to set email alerts
|

Novel Engineered Fiber Based Wellbore Strengthening Material in Prevent and Control Real-Time Loss Circulation While Drilling in Bibi-Hakimeh Oil Field

Majid Heris

Abstract: Loss circulation is one of the most time and cost consuming problems which occurs mostly in naturally fractured formation, induced fractures and also may happen through highly permeable formations and can causes many operational problems such as differential pipe sticking, drill string stuck in the wellbore, drilling fluid costs due to compensate of the lost fluid via the formation, well flow, blowout and etc. controlling severe to total lost circulation in naturally/induced fractured formations has always bee… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 14 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?