Numerical analysis of the causes of face slab cracks in Gongboxia rockfill dam

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

1
20
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 53 publications
(21 citation statements)
references
References 5 publications
1
20
0
Order By: Relevance
“…In the process of casting, the concrete panel is in high risk to yield cracks due to uneven settlement, hydration reaction, and dry shrinkage deformation [1][2][3]. ese cracks can cause seepage and remove fine particles in the panel, which seriously impacts the structural stability, reduces the antiseepage performance and durability of the concrete panel, and becomes a great threat to the safety of the dam [4][5][6][7].…”
Section: Introductionmentioning
confidence: 99%
“…In the process of casting, the concrete panel is in high risk to yield cracks due to uneven settlement, hydration reaction, and dry shrinkage deformation [1][2][3]. ese cracks can cause seepage and remove fine particles in the panel, which seriously impacts the structural stability, reduces the antiseepage performance and durability of the concrete panel, and becomes a great threat to the safety of the dam [4][5][6][7].…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, it is capable of providing high precision simulation at relatively low computational cost. The dual-mortar approach is a promising method in multi-body contact analysis [24][25][26].In the numerical analysis of CFRDs, the contact is mainly modelled by interface element methods [27][28][29][30]. In real CFRD projects, it is usually found that there are large relative displacement and separation between the concrete face and the cushion layer [9].…”
mentioning
confidence: 99%
“…In the numerical analysis of CFRDs, the contact is mainly modelled by interface element methods [27][28][29][30]. In real CFRD projects, it is usually found that there are large relative displacement and separation between the concrete face and the cushion layer [9].…”
mentioning
confidence: 99%
“…[1]. Some cracks emerge in construction period and some are formed during the operating period [2]. Cracks can not only affect the building appearance, but also can bring about a series of serious diseases, like leakage dissolution, environment water erosion, freeze-thaw damage and steel corrosion.…”
Section: Introductionmentioning
confidence: 99%