2014
DOI: 10.4028/www.scientific.net/amm.488-489.424
|View full text |Cite
|
Sign up to set email alerts
|

Numerical Analysis on the Subgrade Settlements in Case of Different Tunneling Excavation Plans across Railway

Abstract: Taking the draw water tunnel of the Jiulong river across railway in Fujian province as the research object,the influence of the subgrade settlement of Yingtan-Xiamen double railway and Xiamen-Shenzhen high-speed railway as a result of the double draw water tunnel excavation is analyzed by FLAC3D. Through numerical simulation the condition of whether the subgrade is reinforcement and whether have train load on the subgrade, the result of subgrade settlement in both single tunnel perforation and double tunnel pe… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles