2013
DOI: 10.7763/ijesd.2013.v4.368
|View full text |Cite
|
Sign up to set email alerts
|

Numerical Modelling for the Extreme Flood Event in the Fitzroy Basin, Queensland, Australia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
9
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(9 citation statements)
references
References 8 publications
0
9
0
Order By: Relevance
“…The major rivers, important gauge locations and geographic location of the study area are shown in Figure 1. The information on area of basin and subcatchment is available in Amir et al (2012Amir et al ( , 2013a).…”
Section: Study Areamentioning
confidence: 99%
See 3 more Smart Citations
“…The major rivers, important gauge locations and geographic location of the study area are shown in Figure 1. The information on area of basin and subcatchment is available in Amir et al (2012Amir et al ( , 2013a).…”
Section: Study Areamentioning
confidence: 99%
“…Flooding from a storm event is one of the major natural disasters in many countries around the world (Cunha et al, 2011;Amir et al, 2013a;Gain and Hoque, 2013). It is a normal ecosystem phenomenon and a natural hydrologic feature of most river systems like the Fitzroy.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…The river branch was digitized along the center of the left and right bank. The cross-sections were automatically extracted along the river branch from the DEM data using the software HEC-Geo RAS [16].…”
mentioning
confidence: 99%