Numerical Simulation of the Construction Process of Long Spiral CFG Piles

Abstract: A numerical model for the construction process of long spiral CFG piles is established based on the coupled Eulerian–Lagrangian method. The construction process is divided into drilling process and concrete pouring process for modeling. The influence of long spiral CFG piles construction on saturated sand foundation is studied, and dynamic responses, changes of pore water pressure, and void ratio of saturated sand foundation are obtained. The rationality and accuracy of the simulation results are proved by com… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 30 publications
0
1
0
Order By: Relevance
“…Where: n can be determined according to the Boussinesq theory, , η is the impact coefficient of the pile end to take into account the influence of the overburden layer on the displacement at the place, generally taken as 0.5~1.0 [25] .…”
Section: Theoretical Analysismentioning
confidence: 99%
“…Where: n can be determined according to the Boussinesq theory, , η is the impact coefficient of the pile end to take into account the influence of the overburden layer on the displacement at the place, generally taken as 0.5~1.0 [25] .…”
Section: Theoretical Analysismentioning
confidence: 99%