2020
DOI: 10.1088/1757-899x/1001/1/012058
|View full text |Cite
|
Sign up to set email alerts
|

On creating optimal working conditions in multi-storey buildings of concrete mixing plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…This is the only opportunity for a civil engineer to be aware of the constant changes in the technology of building materials that is progressing at an ever-increasing pace. The use of integrated information technologies can assist an engineer in understanding and successfully handling the data on the nomenclature, parameters of building materials, and opportunities of building production [4][5][6].…”
Section: Methodsmentioning
confidence: 99%
“…This is the only opportunity for a civil engineer to be aware of the constant changes in the technology of building materials that is progressing at an ever-increasing pace. The use of integrated information technologies can assist an engineer in understanding and successfully handling the data on the nomenclature, parameters of building materials, and opportunities of building production [4][5][6].…”
Section: Methodsmentioning
confidence: 99%
“…The activity of an actor as a set of interconnections existing between the participants in the building becomes transparent if the principles of three unities are observed the unity of design, production and technological, transport processes. For this study, the processes that form the production and logistics unity are of greatest interest [4][5][6][7].…”
Section: Methodsmentioning
confidence: 99%