“…In the second type, named as "stage by stage planning", the planning is conducted for multiple stages while the stages are planned one after the other. In [26,42,43,46,47,59,90,142], stage by stage planning has been done. In the third planning type, named as "simultaneous multistage planning", all the stages are considered simultaneously.…”