2017
DOI: 10.1007/s11253-017-1431-6
|View full text |Cite
|
Sign up to set email alerts
|

On the Solvability of One System of Nonlinear Hammerstein-Type Integral Equations on the Semiaxis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 8 publications
0
1
0
Order By: Relevance
“…The influence of life and travel, and the strong adaptability to geology, small surface settlement, suitable for hard, soft rock underground engineering, in the crossing line, tie line, reentrant line and other complex structure of tunnel section engineering, mining method has the advantages of other methods, and the construction of mining method has laid a foundation for the technology of subway underground excavation [19,20]. At present, the open excavation method, shield method and mining method are mainly used in urban subway tunnel [21,22]. The mining method used in the construction of urban subway tunnel, also called shallow-buried mine method, is a complete set of perfect subway tunnel construction theory and operation method based on the theory of new austrian method, which is based on the concrete engineering conditions of China.…”
Section: Application Of Mining Lawmentioning
confidence: 99%
“…The influence of life and travel, and the strong adaptability to geology, small surface settlement, suitable for hard, soft rock underground engineering, in the crossing line, tie line, reentrant line and other complex structure of tunnel section engineering, mining method has the advantages of other methods, and the construction of mining method has laid a foundation for the technology of subway underground excavation [19,20]. At present, the open excavation method, shield method and mining method are mainly used in urban subway tunnel [21,22]. The mining method used in the construction of urban subway tunnel, also called shallow-buried mine method, is a complete set of perfect subway tunnel construction theory and operation method based on the theory of new austrian method, which is based on the concrete engineering conditions of China.…”
Section: Application Of Mining Lawmentioning
confidence: 99%