Optimal berth scheduling and sequencing under unexpected events

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2025
2025

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 14 publications
(3 citation statements)
references
References 26 publications
0
2
0
Order By: Relevance
“…To deal with uncertainties, reactive and proactive approaches have been discussed. The reactive approach minimizes the deviation from the initial schedule to respond to real‐time disruptions (Zeng et al., 2011; Li et al., 2015; Umang et al., 2017; Xiang et al., 2018; Lv et al., 2020; Kim et al., 2021; Al‐Refaie and Abedalqader, 2022), whereas the proactive approach absorbs uncertainties in a baseline schedule (Lu and Xi, 2010; Xu et al., 2012; Rodriguez‐Molins et al., 2014; Mohammadi and Forghani, 2018; Iris and Lam, 2019; Liu et al., 2020; Zhen et al., 2021). In the literature, studies on proactive approaches are largely divided into two groups: robust and stochastic approaches.…”
Section: Literature Reviewmentioning
confidence: 99%
“…To deal with uncertainties, reactive and proactive approaches have been discussed. The reactive approach minimizes the deviation from the initial schedule to respond to real‐time disruptions (Zeng et al., 2011; Li et al., 2015; Umang et al., 2017; Xiang et al., 2018; Lv et al., 2020; Kim et al., 2021; Al‐Refaie and Abedalqader, 2022), whereas the proactive approach absorbs uncertainties in a baseline schedule (Lu and Xi, 2010; Xu et al., 2012; Rodriguez‐Molins et al., 2014; Mohammadi and Forghani, 2018; Iris and Lam, 2019; Liu et al., 2020; Zhen et al., 2021). In the literature, studies on proactive approaches are largely divided into two groups: robust and stochastic approaches.…”
Section: Literature Reviewmentioning
confidence: 99%
“…A comprehensive review of the BAP under uncertainties was given by [14]. According to the review, uncertain factors regarding the arrival time [15][16][17][18], handling time [19][20][21][22], quay crane breakdown [23][24][25], and unscheduled vessel calling [26,27] were commonly considered in BAP problems. Arrival time and handling time are the most common uncertain parameters to be considered in the BAP.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The objective function (1) minimizes the average waiting time. Constraint (2) determines the makespan, which corresponds to the completion time of all tasks. Constraints (3) and (4) define the first and the last tasks for each quay crane, respectively.…”
mentioning
confidence: 99%