2017
DOI: 10.1017/s0890060417000269
|View full text |Cite
|
Sign up to set email alerts
|

Optimal fuzzy scheduling and sequencing of multiple-period operating room

Abstract: Little research has considered fuzzy scheduling and sequencing problem in operating rooms. Multiple-period fuzzy scheduling and sequencing of patients in operating rooms optimization models are proposed in this research taking into consideration patient‘s preference. The objective of the scheduling optimization model is obtaining minimal undertime and overtime and maximum patients' satisfaction about the assigned date. The objective of sequencing the optimization model is both to minimize overtime and to maxim… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 19 publications
0
3
0
Order By: Relevance
“…Riise et al (2016) presented an ORS model with three-time horizons (daily, weekly, and real-time) and the objective of minimizing surgery time for a hospital in Norway. Al-Refaie et al (2018a) developed multiple-period fuzzy scheduling considering patients' preferences and objectives of minimizing overtime and maximizing patients' satisfaction. Belkhamsa et al (2018) studied ORS with resource constraints in pre-operative, intraoperative, and postoperative stages and availability of material resources, specialties, and human resources.…”
Section: Planning and Scheduling Operating Rooms Under Deterministic Conditions Using Open Schedulingmentioning
confidence: 99%
“…Riise et al (2016) presented an ORS model with three-time horizons (daily, weekly, and real-time) and the objective of minimizing surgery time for a hospital in Norway. Al-Refaie et al (2018a) developed multiple-period fuzzy scheduling considering patients' preferences and objectives of minimizing overtime and maximizing patients' satisfaction. Belkhamsa et al (2018) studied ORS with resource constraints in pre-operative, intraoperative, and postoperative stages and availability of material resources, specialties, and human resources.…”
Section: Planning and Scheduling Operating Rooms Under Deterministic Conditions Using Open Schedulingmentioning
confidence: 99%
“…Various methods such as robust optimization, stochastic programming, and fuzzy approach have been utilized to deal with uncertainty in operating room planning and scheduling problems. Al-Refaie et al 28 addressed a scheduling and sequencing problem for a multiple period operating room model. They developed some models by considering the preferences of patients to deal with the uncertainty in their problem.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In addition, CPT is a commonly used soil exploration survey in engineering applications because it is quick, economic, and could continuously obtain physical soil parameters (Eslami, 1997; Abu-Farsakh and Titi, 2004). In recent years, some researchers developed concepts of advanced artificial intelligence (AI) in different engineering applications, such as engineering mechanics, design of energy-saving buildings, automation, and construction (Coello and Aguirre, 2002; Nariman-Zadeh et al ., 2003; Hanna, 2007; Padmini et al ., 2008; Rossi and Lanzetta, 2013; Hu et al ., 2014; Zeng et al ., 2014; Kontovourkis et al ., 2015; Salido et al ., 2015; Adeniran and El-Ferik, 2017; Persson and Ölvander, 2017; Thimmisetty et al ., 2017; Al-Refaie et al ., 2018; Keles, 2018; Lin and Huang, 2018; Mirabi and Seddighi, 2018; Zimmermann et al ., 2018). In recent years, applications of AI models have become widespread through civil engineering projects (e.g., Armaghani et al ., 2017, 2018; Koopialipoor et al ., 2018).…”
Section: Introductionmentioning
confidence: 99%