Optimal job scheduling to minimize total tardiness by dispatching rules and community evaluation chromosomes

Abstract: In traditional scheduling, job processing times are assumed to be fixed. However, this assumption may not be applicable in many realistic industrial processes. Using the job processing time of real industrial processes instead of a fixed value converts the deterministic model to a stochastic one. This study provides three approaches to solving the problem of stochastic scheduling: stochastic linguistic, stochastic scenarios, and stochastic probabilistic. A combinatorial algorithm, dispatching rules and communi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 32 publications
0
2
0
Order By: Relevance
“…If the null hypothesis is not accepted, ANOVA simply expresses that there is a substantial dissimilarity among the methods employed without providing any further details. Post hoc tests are thus carried out to identify the discrepancies between techniques [48]. In Jeffreys's Amazing Statistics Programme (JASP), an open source statistical programme, the ANOVA test is run on the R 2 , RMSE, and MAE of ML techniques applied to labour, seed, fertilizers and manure, insecticides, and irrigation costs, which are the components of the operational costs of crop cultivation.…”
Section: Anova Statistical Test Validation Of ML Methodsmentioning
confidence: 99%
“…If the null hypothesis is not accepted, ANOVA simply expresses that there is a substantial dissimilarity among the methods employed without providing any further details. Post hoc tests are thus carried out to identify the discrepancies between techniques [48]. In Jeffreys's Amazing Statistics Programme (JASP), an open source statistical programme, the ANOVA test is run on the R 2 , RMSE, and MAE of ML techniques applied to labour, seed, fertilizers and manure, insecticides, and irrigation costs, which are the components of the operational costs of crop cultivation.…”
Section: Anova Statistical Test Validation Of ML Methodsmentioning
confidence: 99%
“…One approach to creating schedules in a parallel machine environment is through the utilization of priority sequencing rules, allowing schedules to evolve. When a workstation is ready for further processing, the selection of the next job to be processed is made based on these priority sequencing rules [6,8] .…”
Section: Parallel Machine Schedulingmentioning
confidence: 99%