2021
DOI: 10.3390/en14092398
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Management of a Microgrid with Radiation and Wind-Speed Forecasting: A Case Study Applied to a Bioclimatic Building

Abstract: An Energy Management System (EMS) that uses a Model Predictive Control (MPC) to manage the flow of the microgrids is described in this work. The EMS integrates both wind speed and solar radiation predictors by using a time series to perform the primary grid forecasts. At each sampling data measurement, the power of the photovoltaic system and wind turbine are predicted. Then, the MPC algorithm uses those predictions to obtain the optimal power flows of the microgrid elements and the main network. In this work,… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 41 publications
0
3
0
Order By: Relevance
“…In this subsection, our goal is to derive an admissible set of the switching curve parameters, for which conditions (24) and (35) are fulfilled. Therefore, inequality (28) has to be true and ι has to satisfy both restrictions (33) and (40).…”
Section: Control Signal and System's Velocity Constraintsmentioning
confidence: 99%
See 2 more Smart Citations
“…In this subsection, our goal is to derive an admissible set of the switching curve parameters, for which conditions (24) and (35) are fulfilled. Therefore, inequality (28) has to be true and ι has to satisfy both restrictions (33) and (40).…”
Section: Control Signal and System's Velocity Constraintsmentioning
confidence: 99%
“…Now, we will derive the minimal regulation time, for which inequality (24) is fulfilled for any t ≥ 0. Moreover, we will decide which strategy is the most beneficial: the one in which the switching curve stops during the control process or the one in which the sliding line moves for the whole control process.…”
Section: Settling Time Minimization With the Control Signal Constraintmentioning
confidence: 99%
See 1 more Smart Citation