2018
DOI: 10.1016/j.swevo.2017.09.005
|View full text |Cite
|
Sign up to set email alerts
|

Optimal planning of distributed energy resources in harmonics polluted distribution system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 36 publications
(21 citation statements)
references
References 33 publications
0
21
0
Order By: Relevance
“…Line current constraints: The current flow in each line ( ) is limited due to its maximum current carrying capacity ( ), and mathematically, it is expressed by [36,37] (Equation 14).…”
Section: 42inequality Constraintsmentioning
confidence: 99%
“…Line current constraints: The current flow in each line ( ) is limited due to its maximum current carrying capacity ( ), and mathematically, it is expressed by [36,37] (Equation 14).…”
Section: 42inequality Constraintsmentioning
confidence: 99%
“…The modification made to the classical 69 bus test system to obtain a DC version consists of eliminating the reactive component in both the branches and the power consumption for all the nodes. On the other hand, the system preserves the number of nodes and branches, the resistance values of branches and the power load and voltage level reported in [57]. Figure 6 presents the line diagram of the grid.…”
Section: The 21 Bus Test Systemmentioning
confidence: 99%
“…DESs need higher technical requirements, because the technology of DESs is not yet popular, and the technology is not mature enough [62,63]. The decentralized application of DESs requires a large number of relevant professionals to achieve high popularization.…”
Section: Noxious Gas Emissionmentioning
confidence: 99%