2017
DOI: 10.1016/j.seppur.2016.08.009
|View full text |Cite
|
Sign up to set email alerts
|

Optimal scheduling of multiple sets of air separation units with frequent load-change operation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
20
0
1

Year Published

2018
2018
2021
2021

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 49 publications
(24 citation statements)
references
References 21 publications
0
20
0
1
Order By: Relevance
“…Mode-based models have been applied in some of the most recent works on DSM planning and scheduling (Shrouf et al, 2014;Zhang et al, 2015aZhang et al, , 2016aZhou et al, 2017). In the most recent development, Zhang et al (2016e) have further generalized the model such that it can be used to represent continuous process networks.…”
Section: Prevalent Modeling Conceptsmentioning
confidence: 99%
See 2 more Smart Citations
“…Mode-based models have been applied in some of the most recent works on DSM planning and scheduling (Shrouf et al, 2014;Zhang et al, 2015aZhang et al, , 2016aZhou et al, 2017). In the most recent development, Zhang et al (2016e) have further generalized the model such that it can be used to represent continuous process networks.…”
Section: Prevalent Modeling Conceptsmentioning
confidence: 99%
“…The proposed model has been adopted by Zhang et al (2016a) to simultaneously optimize the long-term electricity procurement strategy for multiple air separation plants. A similar approach is taken by Zhou et al (2017) who also consider the interactions between multiple air separation units. Although Zhou et al (2017) consider demand rather then electricity price changes, the proposed model can be easily extended to be applied in a classical DSM setting.…”
Section: Across Multiple Space Scalesmentioning
confidence: 99%
See 1 more Smart Citation
“…Xu et al proposed a two-layer framework automatic load change system integrated with nonlinear steady-state optimization and nonlinear model predictive control (MPC) for the nonlinearity, strong coupling and frequent load change of air separation systems (Xu et al, 2011). Zhou et al developed an optimal scheduling method under separate-mode strategy for the multiple sets of air separation units and the requirements of frequent load-change operation (Zhou et al, 2017). Fu and Liu studied the nonlinear behaviors of heat integrated air separation columns and carried out a novel nonlinear wave model predictive control scheme for them (Fu & Liu, 2015.…”
Section: Introductionmentioning
confidence: 99%
“…The same topic was addressed in Zhang et al (2016c) whereby the combination of mode-based modeling approach and CRS models is used to model a network of continuous power-intensive processes. A similar approach was applied by Zhou et al (2017) to examine the optimal scheduling of a real-world production network.…”
Section: Introductionmentioning
confidence: 99%