2015 IEEE Energy Conversion Congress and Exposition (ECCE) 2015
DOI: 10.1109/ecce.2015.7310106
|View full text |Cite
|
Sign up to set email alerts
|

Optimal sizing of distributed generations in a connected DC micro-grid with hybrid energy storage system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 7 publications
0
2
0
Order By: Relevance
“…Unlike the conventional unit commitment problem which depends on a priori information, this method is not as more suitable for practical implementation as it does not require prior RES and load information. A day ahead unit commitment operation is solved in [81] using a heuristic optimization technique to minimize the total operation cost and carbon dioxide while scheduling the [56] Battery cost minimization total energy consumption is reduced reliability is not improved load management and ESS location MILP [57]- [59] Not specified cost minimization (investment and operation) reduction in power conversion loss -DE [60], [61] battery and supercapacitor battery life cycle maximization and cost minimization the microgrids configuration is optimized SOC is not well managed Compro mise Programming (CP) [62] battery daily worth maximization and cost minimization effective sizing with minimal cost system operational requirements are not considered PSO [63]- [65] battery minimization of annualized capital cost, and operation loss of power supply probability is reduced, assumption is made based on & maintenance cost limited RES sensitive analysis [66] not specified maximization control performance and optimal node selection for ESS variation of the grid constructions minimization power losses mitigation of power and energy variation and parameters are not considered GWO [67], [68] battery minimization net present cost optimized configuration is selected -DP optimization [69] vanadium redox battery ESS cost load uncertainty improvement PQ issues are unsolved NSGA-II [70] hybrid SMES-flywheel maximize the power delivered, cost reduction and performance improvement solution procedure is minimize power fluctuation and costs time-consuming probabilistic approach [71], [72] battery investment cost minimization optimal size of battery when time-of-use sensitivity analysis with random (ToU) is used uncertainties are well handled input variables should be investigated linear programming [73] hydrogen storage cost and carbon emission minimization reduced carbon emission size of hydrogen storage is larger than battery power among different microgrids units. This approach also effectively eliminates congestion according to congestion signals by optimally scheduling different units.…”
Section: A Unit Commitmentmentioning
confidence: 99%
“…Unlike the conventional unit commitment problem which depends on a priori information, this method is not as more suitable for practical implementation as it does not require prior RES and load information. A day ahead unit commitment operation is solved in [81] using a heuristic optimization technique to minimize the total operation cost and carbon dioxide while scheduling the [56] Battery cost minimization total energy consumption is reduced reliability is not improved load management and ESS location MILP [57]- [59] Not specified cost minimization (investment and operation) reduction in power conversion loss -DE [60], [61] battery and supercapacitor battery life cycle maximization and cost minimization the microgrids configuration is optimized SOC is not well managed Compro mise Programming (CP) [62] battery daily worth maximization and cost minimization effective sizing with minimal cost system operational requirements are not considered PSO [63]- [65] battery minimization of annualized capital cost, and operation loss of power supply probability is reduced, assumption is made based on & maintenance cost limited RES sensitive analysis [66] not specified maximization control performance and optimal node selection for ESS variation of the grid constructions minimization power losses mitigation of power and energy variation and parameters are not considered GWO [67], [68] battery minimization net present cost optimized configuration is selected -DP optimization [69] vanadium redox battery ESS cost load uncertainty improvement PQ issues are unsolved NSGA-II [70] hybrid SMES-flywheel maximize the power delivered, cost reduction and performance improvement solution procedure is minimize power fluctuation and costs time-consuming probabilistic approach [71], [72] battery investment cost minimization optimal size of battery when time-of-use sensitivity analysis with random (ToU) is used uncertainties are well handled input variables should be investigated linear programming [73] hydrogen storage cost and carbon emission minimization reduced carbon emission size of hydrogen storage is larger than battery power among different microgrids units. This approach also effectively eliminates congestion according to congestion signals by optimally scheduling different units.…”
Section: A Unit Commitmentmentioning
confidence: 99%
“…Additionally, the HESS can also be effectively utilized for peak shaving [102] and valley filling operations [103], hence improving the power quality of the RES microgrid. An evolutionary algorithm is proposed [104], for an economic optimal sizing of HESS in a grid-connected DC microgrid considering the cost of power purchase from the grid, BESS-SCSS sizing, and continuous power supply for numerous load conditions.…”
Section: Demand-generation Power Flow Managementmentioning
confidence: 99%