2017
DOI: 10.1177/1369433217737116
|View full text |Cite
|
Sign up to set email alerts
|

Optimal transverse position for overweight trucks to cross simply supported multi-girder bridges

Abstract: Recent years has witnessed a steady increase in the issued overweight vehicle permits. Damage and deterioration of bridges caused by overweight vehicles have received increasing attention. Most previous studies on overweight vehicles have focused on the routing and weight regulation of overweight trucks while little attention has been paid to the determination of the optimal transverse position for overweight trucks to cross highway bridges. This article aims to investigate the optimal transverse position for … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 20 publications
0
2
0
Order By: Relevance
“…On the basis of previous work 21 , 22 , this study has developed a non-blasting, efficient rapid demolition technology for crossline symmetrical rigid frame arch bridge based on SPMT, the aim of which is to minimize traffic closure duration and mitigate the environmental and traffic impact during the demolition process. The investigation focuses on addressing the critical technical challenges encountered during the demolition procedure.…”
Section: Introductionmentioning
confidence: 99%
“…On the basis of previous work 21 , 22 , this study has developed a non-blasting, efficient rapid demolition technology for crossline symmetrical rigid frame arch bridge based on SPMT, the aim of which is to minimize traffic closure duration and mitigate the environmental and traffic impact during the demolition process. The investigation focuses on addressing the critical technical challenges encountered during the demolition procedure.…”
Section: Introductionmentioning
confidence: 99%
“…Pierce and Kirtan (2015) analyzed the I-84 bridge stress from differing support conditions at different construction stages and the worst-case scenario of a local loss of support during bridge movement by a SPMT. Yan et al (2018) investigated the optimal transverse position for overweight trucks to cross simply supported multiple-girder bridges. Attanayake and Aktan (2018) developed a multicriteria decision-support model to identify the most preferable construction methods for selected sites.…”
Section: Introductionmentioning
confidence: 99%