2023
DOI: 10.29407/jmn.v6i2.19890
|View full text |Cite
|
Sign up to set email alerts
|

Optimalisasi Generator Dan Panel Kontrol Pada Alat Pembangkit Listrik Tenaga Sampah (Pltsa) Kapasitas 5 Kg

Fajar Shohih Muhlisin -,
Marno Marno,
Ratna Dewi Anjani

Abstract: Part of the Waste Power Plant (PLTSa) is the control panel. In the previous research on its use, namely the type of generator with a power output of 500 W, with a voltage output of 11.9 V and the duration of charging the battery by the generator for 8 hours with the direct jumper method to the battery. The purpose of this study is to determine the process of obtaining current and voltage from the generator to the battery & to determine the battery charging speed. The research method for this PLTSa device i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 4 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?