2010
DOI: 10.1504/ijleg.2010.037520
|View full text |Cite
|
Sign up to set email alerts
|

Optimisation of sequencing and scheduling in hybrid flow shop environment using heuristic approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2012
2012
2016
2016

Publication Types

Select...
4
1

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…In manufacturing systems, since the scheduling problems are NP-hard, an efficient approach is required to get best results (Buil et al, 2010;Sridhar et al, 2010). Recently, a fuzzy logic approach has been widely applied to the scheduling problems for both conventional…”
Section: A Review Of the Literaturementioning
confidence: 99%
“…In manufacturing systems, since the scheduling problems are NP-hard, an efficient approach is required to get best results (Buil et al, 2010;Sridhar et al, 2010). Recently, a fuzzy logic approach has been widely applied to the scheduling problems for both conventional…”
Section: A Review Of the Literaturementioning
confidence: 99%
“…There are proposed in manufacturing industry and nonmanufacturing industry. The manufacturing industries are electronics industries (Wittrock, 1985(Wittrock, , 1988Liu & Chang 2000;Jin et al, 2002), Paper industry (Sherali, Sarin, & Kodialam, 1990), textile industry (Grabowski & Pempera, 2000) and stainless steel manufacturing (Sridhar, Prabaharan, & Saravanan, 2010). The non-manufacturing industries are also like civil engineering (Dror & Mullaserif, 1996), internet service architectures (Allahverdi & Al-Anzi, 2006) and container handling systems (Chen et al, 2007).…”
Section: Real World Scenario Problemsmentioning
confidence: 99%
“…This includes exact methods, heuristics and meta-heuristics. The simulated annealing algorithm proposed for five stage hybrid flow shop scheduling (Sridhar, Prabaharan, & Saravanan, 2010). This paper considered hybrid flow shop scheduling problem with missing operation.…”
Section: Real World Scenario Problemsmentioning
confidence: 99%
“…The dispatching rules, heuristics and branch and bound method considered for two-stage assembly shop with two independent machines in the first stage and two assembly identical machines in the second stage [10]. The SA algorithm proposed to optimize the company production sequence in real world multi-stage hybrid flow shop scheduling problems with missing operations [11]. The computational result shows that the SA algorithm yields good quality solution than existing company production sequence result.…”
Section: Introductionmentioning
confidence: 99%