“…Up to now, many research workers who major in the tunnel project bring a large number of mathematical analysis methods into the analysis of the stability of the slope such as block limit equilibrium method imbalance thrust method, Principle of red flat projection analysis (Jin, Cui, & Lu, 2000;Xiao, 2001;Yang & Cheng, 2002). Along with the development of computer technology, the researchers also bring the simulation research into the field (Tang, Wang, & Li, 2011;Zhang, Lou, Huang, Liu, & Yang, 2011;Zhao, Shao, & Hang, 2009). A preliminary study of the engineering stability of the Shilou tunnel in the Hipparion red clay were studied by the establishing of finite element numerical model (Peng, Ma, Wang, & Xie, 2013;Wang, Gao, Quan, & Qin, 2014;Wang & Wang, 2009;Wang, Xia, & Gu, 2013;Xie & Wang, 2004).…”