IADC/SPE Drilling Conference 2004
DOI: 10.2118/87171-ms
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of Big-Bore HTHP Wells to Exploit a Low Pressure Reservoir in Indonesia

Abstract: fax 01-972-952-9435. AbstractA Big-Bore HTHP drilling and completion program of seven wells was undertaken under challenging conditions in a low pressure carbonate reef in Indonesia. Significant enhancements made during the program substantially reduced well times and cost. These wells incorporated the largest tubingless gas completions in the world. Higher than anticipated initial flow rates were achieved through an innovative strategy to decrease formation damage. The wells were completed open-hole without p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2006
2006
2015
2015

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 13 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…The primary scope of the study was to review existing developments to understand field proven designs. The study focused on a global review 2,3,4,5,6,7,8,9,10,11,12,13,14,15,18 of ultra-high rate gas wells which included nine (9) areas and over 130 wells. 16 This study, combined with the experiential knowledge of the team, resulted in a design that integrated the field proven lower…”
Section: Feasibility Studymentioning
confidence: 99%
“…The primary scope of the study was to review existing developments to understand field proven designs. The study focused on a global review 2,3,4,5,6,7,8,9,10,11,12,13,14,15,18 of ultra-high rate gas wells which included nine (9) areas and over 130 wells. 16 This study, combined with the experiential knowledge of the team, resulted in a design that integrated the field proven lower…”
Section: Feasibility Studymentioning
confidence: 99%