2010
DOI: 10.1016/j.autcon.2010.02.005
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of material hoisting operations and storage locations in multi-storey building construction by mixed-integer programming

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 21 publications
(11 citation statements)
references
References 27 publications
0
11
0
Order By: Relevance
“…Various λ needs to be utilized for different locations of crane k for determining location-specific effects in a construction site. Having high-tech vision tools in tower cranes help operators to see better and at the same time help the operation to carry out faster which means a smaller λ is applicable [25].…”
Section: Tower Crane Selection and Layout Problem (Tcslp)mentioning
confidence: 99%
“…Various λ needs to be utilized for different locations of crane k for determining location-specific effects in a construction site. Having high-tech vision tools in tower cranes help operators to see better and at the same time help the operation to carry out faster which means a smaller λ is applicable [25].…”
Section: Tower Crane Selection and Layout Problem (Tcslp)mentioning
confidence: 99%
“…First, some of the previous studies have developed the optimization model to minimize the operating time and rental cost for the vertical transportation in a skyscraper construction. Huang et al () optimized the material hoisting operation by using a GA and mixed‐integer linear programming method. Shin et al () developed a GA‐based simulation model for establishing the optimal hoist planning for workers and materials.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Materials management is one of the most important aspects of construction SCM. Research on construction projects inventory optimization is aimed at providing guidelines for on-site construction material management (Thomas, Riley & Messner, 2005); numerous works have been devoted to optimization of construction site layouts (El-Gafy & Ghanem, 2010, Huang, Wong & Tam, 2010 to minimize material handling.…”
Section: Materials Supply Management In Constructionmentioning
confidence: 99%