2020
DOI: 10.15407/pge2020.02.017
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of the equipment structure of a photovoltaic solar power plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…As the results of the study [4] show, for the 10 MW PV station, located in the south of Ukraine, the lowest cost is achieved with DC/AC ratio of 1.4. At the same time, when the inverters are overloaded with excess power of PV modules, part of electricity that has to be output to power system is lost.…”
Section: Introductionmentioning
confidence: 85%
“…As the results of the study [4] show, for the 10 MW PV station, located in the south of Ukraine, the lowest cost is achieved with DC/AC ratio of 1.4. At the same time, when the inverters are overloaded with excess power of PV modules, part of electricity that has to be output to power system is lost.…”
Section: Introductionmentioning
confidence: 85%